Qianchuan Electric supports flexible order quantities to meet different project requirements. For standard distribution transformers, the minimum order quantity is generally 1 unit. For customized power transformers, dry-type transformers, oil-immersed transformers, and prefabricated substations, we also accept single-unit project orders. For large-scale EPC projects or batch procurement, we can arrange production schedules and delivery plans according to the total quantity, technical specifications, and project timeline.
The typical production lead time depends on transformer capacity, voltage level, design complexity, and order quantity. For standard distribution transformers, production generally takes approximately 25–35 working days after technical confirmation and receipt of the agreed advance payment. Customized medium-voltage and high-voltage power transformers may require 45–90 working days or longer, depending on engineering requirements. Before production, we confirm the technical drawings, specifications, and delivery schedule with the customer. Each unit undergoes the required factory inspections and testing before shipment.
Yes. Qianchuan Electric provides customized transformer solutions based on project-specific electrical requirements. We manufacture oil-immersed and dry-type transformers with different voltage ratios, capacities, connection groups, impedance values, and cooling methods. Typical applications include 10/0.4 kV distribution transformers, 33/11 kV power transformers, 66/11 kV substations, and 110 kV power transformers. Transformer capacities, tap changers, temperature-rise limits, enclosure protection ratings, and accessory configurations can also be customized. Customers can submit their technical specifications or single-line diagrams for engineering evaluation and quotation.
Our transformer designs and manufacturing processes can be configured to meet applicable international standards, including IEC 60076, ANSI/IEEE C57, and relevant GOST requirements. For projects requiring UL compliance, the applicable product category, certification scope, components, and testing requirements must be reviewed individually. Depending on the destination market, we can evaluate insulation levels, temperature-rise limits, efficiency requirements, short-circuit withstand capability, and electrical clearances. Before order confirmation, our engineering team reviews the customer's requested standards and prepares a technical compliance document to identify the applicable requirements and any necessary design modifications.
Yes. Every transformer undergoes applicable routine tests before leaving our factory. Depending on the transformer type and agreed technical specification, routine tests may include winding resistance measurement, voltage ratio and phase displacement verification, insulation resistance measurement, no-load loss and current measurement, load loss and impedance voltage measurement, applied voltage withstand tests, and induced voltage withstand tests. Type tests, such as temperature-rise tests, lightning impulse tests, and short-circuit withstand tests, can be provided when required and subject to the applicable product design and test arrangements.
The choice depends on the installation environment, fire safety requirements, operating conditions, and project budget. Oil-immersed transformers are generally suitable for outdoor substations, utility distribution networks, renewable energy plants, and applications requiring higher capacities and efficient heat dissipation. Dry-type transformers are often preferred for indoor installations, commercial buildings, hospitals, data centers, and industrial facilities where fire safety, reduced oil-related risks, and simplified maintenance are important. For example, a 10/0.4 kV dry-type transformer may be suitable for an indoor distribution room, while an outdoor 33/11 kV oil-immersed transformer may be more appropriate for a utility substation.
Qianchuan Electric provides export packaging solutions according to transformer dimensions, weight, transportation methods, and destination requirements. Standard export packaging may include reinforced wooden cases, steel-frame protection, moisture-proof wrapping, anti-corrosion treatment, and secure internal fixation. For large oil-immersed power transformers, transportation arrangements may include separate shipment of accessories, impact monitoring, and special lifting and loading instructions. Before shipment, we check the packaging condition, lifting points, identification labels, and shipping documents. Packaging and loading methods are confirmed according to sea freight, land transportation, or multimodal logistics requirements.
Our standard warranty proposal is generally 12 months after commissioning or 18 months after shipment, whichever occurs first, subject to the final sales contract. The warranty covers manufacturing defects and material quality issues under normal operating conditions and in accordance with the approved technical specifications. If a quality issue occurs, customers can provide photographs, operating records, test data, and the equipment serial number for our technical team to investigate. Depending on the confirmed cause, we will provide technical guidance, replacement parts, repair solutions, or other remedies according to the agreed warranty terms.
Yes. We can provide technical documents for customer approval before manufacturing. Depending on the project scope, the documentation package may include general arrangement drawings, transformer outline drawings, terminal and connection diagrams, nameplate details, technical data sheets, foundation requirements, and accessory lists. For engineering projects, we can also coordinate drawing revisions according to customer comments and project specifications. Typically, preliminary drawings are submitted after order confirmation and initial engineering review. Production begins after the customer approves the required drawings and technical parameters, helping reduce design misunderstandings and installation risks.
Our payment terms are determined by the order value, product type, customization requirements, and cooperation history. A common arrangement for export orders is a 30% advance payment by T/T after signing the contract, with the remaining 70% payable before shipment after completion of production and factory inspection. For large-scale power transformer projects, alternative payment arrangements, such as staged payments linked to drawing approval, manufacturing progress, or inspection milestones, may be negotiated.
For large power transformers, providing a complete physical sample is generally impractical due to their size, weight, and customized design. However, we can provide product photographs, manufacturing videos, technical drawings, component specifications, and relevant test records for evaluation. For accessories and spare parts, we can supply items such as bushings, temperature indicators, pressure relief valves, cooling fans, gaskets, and other compatible components according to the original equipment specifications.
Yes. We can provide available company qualifications, product certificates, quality inspection documents, and project-related technical records according to the product type and destination market. Depending on the applicable product and project requirements, the document package may include ISO management system certificates, CE documentation, applicable UL certification records, EAC documentation where available, product inspection reports, routine test reports, and material or component certificates. Customers requiring specific certifications, such as GOST-related documentation or local utility approvals, should inform us before ordering so that we can verify the certification scope, availability, validity, and any additional testing requirements.